Old carpet and pad from one or two rooms go in a 13-yard dumpster, and heavy tile adds weight quickly, so tell us the floor when you book. A few rooms of carpet, or a tiled kitchen and bath, make a big pile. Carpet and tile load very differently, so plan the dumpster around the floor you're tearing out.
Read on for the order of a flooring tear-out, how to load each kind of floor, and which size of our dumpster rental around Charleston fits.
In what order does a flooring tear-out go?
Empty the room first. Move the furniture out, then pull the baseboards and the transition strips at the doorways. Set the baseboards aside if you plan to reuse them, and mark which wall each piece came from.
Then take the floor up in layers. On a carpeted room, cut and roll the carpet, then the pad, then pull the tack strips and the pad staples. On a tiled room, break and scrape the tile, then the thinset mortar, then the backerboard if it's coming up too. Clear each layer out to the dumpster before you start the next, so you aren't working on top of loose debris.
What safety steps matter on a flooring job?
Wear knee pads, gloves and closed shoes for every flooring job. Breaking tile throws sharp chips, so wear eye protection and long sleeves for that part. Scraping thinset and old adhesive raises dust, so wear a dust mask and keep a window open.
Older sheet vinyl, vinyl tile and the black adhesive under some old floors can contain asbestos. If your floor is old, have a sample tested before you scrape or break it up.
How do you load carpet and pad?
Carpet is bulky more than it is heavy. The carpet and the foam pad take up a lot of room in a dumpster without adding much weight, so you plan a carpet job by space.
Cut the carpet into strips about 3 feet wide with a utility knife, working from the back side. Roll each strip as tight as you can and tape or tie it. Do the same with the pad. Tight rolls stack flat along the floor of the dumpster, and you fit far more carpet that way than you would loose.
Which size fits a carpet or flooring job?
Carpet from one or two rooms fits the 13-yard dumpster, which includes 1 ton and 5 days. Flooring across a few rooms goes in the 17-yard dumpster, which includes 1.5 tons and 5 days. If you're pulling the floors out of a full house and adding furniture and old trim, the 22-yard dumpster includes 2 tons and 7 days.
Our dumpster size guide compares all four sizes side by side.
How do you plan for tile, thinset and backerboard?
Tile is heavy. The tile, the thinset mortar under it and the cement backerboard below that are all dense. A tiled floor doesn't look like much once it's broken into a pile, but the weight adds up fast, and a dumpster half full of tile can weigh more than a full load of carpet.
Tile goes in the 13, 17 or 22 with the rest of the flooring debris. Have the square footage ready when you book, and say whether the backerboard and mortar are coming up too. We'll match the size to the weight as well as the space. Weight over the included tons is covered in your booking terms.
Load tile in an even layer across the floor of the dumpster rather than in one corner. Buckets of broken tile are heavy, so fill them halfway and make more trips. Put lighter material, like carpet rolls and trim, on top.
What about wood, laminate and vinyl floors?
Hardwood, engineered wood and laminate are lighter than tile and heavier than carpet. Pry the boards up in long pieces and stack them flat. Laminate and vinyl plank come up in strips and stack easily. Sheet vinyl rolls up like carpet. All of these go in the 13, 17 or 22.
If you're pulling up a subfloor too, plywood sheets stack flat along the bottom of the dumpster. Cut them in half if they're hard to carry. Pull or bend over any nails sticking out of the boards before they go in.
How do you handle tack strips, staples and nails?
Carpet tack strips are lined with sharp points, and pad staples stay in the subfloor. Pull the tack strips with a flat bar and gloves. Bundle them nail side in, or wrap them in a piece of old carpet before they go in the dumpster. Pull the staples with pliers, then sweep the room with a broom and run a magnet over the floor to catch what's left.
How should you split a mixed flooring job?
Carpet in the bedrooms and tile in the kitchen and bath is a common mix. You have two choices. Put it all in one 17 or 22, with the tile spread across the bottom and the carpet rolls on top. Or tear out the tile first, call for a swap-out when the dumpster is full, and load the carpet into the empty one.
If you're not sure how to split it, text or call (843) 800-0689 and describe the floor: the square footage, what's coming up, and what else is going in.
How long does a flooring rental run?
A one-room carpet job can be done in a day. Tile across several rooms can take a week or more, since breaking and scraping go slowly. A flooring rental can run up to 30 days, and longer if you call. If the installer is running late, call and extend.
Our dumpster rental cost page explains what goes into the price.
Common questions about flooring tear-outs
How many rooms of carpet fit in a 13-yard?
It depends on the room sizes and how tightly you roll it. Rolled tight, the carpet and pad from one or two rooms fit in a 13. For flooring across a few rooms, take the 17.
Does tile go in the same dumpster as carpet?
It can. Spread the tile across the bottom and put the carpet rolls on top. Give us the square footage of the tile, since it adds weight.
Do I need to pull the tack strips?
If you're replacing the carpet, yes. Bundle them nail side in or wrap them in old carpet before they go in the dumpster.
Can the old subfloor go in too?
Yes. Plywood and particle board subfloor go in. Stack the sheets flat along the bottom.
Not sure which size fits your floor? Text or call (843) 800-0689 any day of the week.
Need a dumpster in Charleston? Call or text Tony at (843) 800-0689, or order online.
(843) 800-0689 Get instant pricing
