For a deck removal, a 13-yard dumpster holds the boards, railings and posts, and concrete footers go in a 7-yard. Once the boards are off, you have a pile to deal with. A deck demo leaves a big pile of lumber, railings and posts, so plan the dumpster before you start.
Family Trash offers James Island roll-off dumpster rental, and the steps below cover a deck tear-out.
How heavy is an old deck?
Most deck lumber is pressure-treated pine. It's bulky, but it isn't dense the way concrete is. A deck's worth of boards, joists, railings, balusters and posts takes up a lot of room for its weight, so you mostly plan a wood deck by space.
Composite decking weighs more per board than wood, and it goes in the same dumpsters. Tell us which kind you have when you book. The metal hardware, like joist hangers, post brackets and screws, goes in with the wood.
Which size fits a deck tear-out?
The 13-yard dumpster fits a typical deck off the back of a house. At 12 by 7 by 4 feet, it fits a deck's boards and joists, with 1 ton and 5 days included. For a big wraparound, a two-level deck or a deck plus stairs and a pergola, describe it when you book.
The 13 also takes furniture, yard brush and general remodeling debris, so if the deck project spreads into the yard or the garage, the same dumpster fits it. Our dumpster size guide compares all four sizes.
What do you do with the concrete footers?
The wood is bulky, but the concrete footers under the posts are heavy. The same goes for an old patio pad or sidewalk you break up while you're back there.
Clean concrete goes in the 7-yard dumpster. Clean footers go to a recycle plant and have no overweight charge, and footers mixed with deck boards or trash go to the landfill and are charged by weight. Tony tells customers this at drop-off. Knock the wood off each footer so the load stays clean.
If you're pulling only a few small footers, mention them when you book and we'll tell you how to handle them. If you're pulling a dozen piers or a patio slab, get the 7-yard for that and keep it separate from the lumber. If the job needs a 7-yard for the concrete and a 13 for the rest, tell us when you book.
What order should you take a deck apart in?
Take off the railings and balusters first. Then pull the deck boards. Screws come out with a drill, and nailed boards come up with a pry bar. Next come the joists and beams, then the posts. Do the stairs when you reach that side.
On a raised deck, work from the outer edge back toward the house, and leave the beams and posts under a section until its boards and joists are off. Stay out from under a section you're cutting loose. The ledger board, where the deck attaches to the house, comes off last. Go slowly there and check the siding and flashing behind it, since that part of the house needs attention before a new deck goes on.
Wear gloves, eye protection and boots. Old decks can have rotted boards, so stay off any section you've already loosened.
How do you load deck lumber so it fits?
Pull nails and screws, or hammer them flat, before the boards go in. Stack long boards flat and in the same direction instead of crisscrossing them, and you'll fit a lot more. Cut long joists in half if they're hard to carry.
Break railing sections apart and snap the balusters out, since long railing sections leave empty space around them. Break lattice skirting into smaller pieces for the same reason. Posts can go in as they are. Keep the stacked lumber below the top edge of the dumpster.
What do you do with pressure-treated boards?
Load pressure-treated lumber into the dumpster. Burning it in a fire pit puts the treatment chemicals into the smoke and ash. If some boards are still sound and you want to reuse them, set those aside before demo day.
What about what's stored under the deck?
Clear out what's stored under the deck before you start pulling boards. Old pots, broken furniture, lumber offcuts and toys go in the same dumpster. Old deck furniture, grills, paint and stain go in too. Tell us what's going in when you book.
Where should the dumpster go?
A driveway near the deck works best. Keep the carry from the tear-out to the dumpster short so you aren't carrying boards across the yard in the heat. Tell us the spot when you book. If you book online, Tony calls to confirm the order, and you can go over the spot then.
A dumpster on your driveway needs no permit. If it has to go in a City of Charleston street, the city requires a permit, and you pull it.
How long should a deck rental run?
A deck demo is hot, heavy work in a Charleston summer, and you can spread it over a few weekends. The 13 includes 5 days, and we'll add days if you call. Tear out a section, load it, and come back to it. If you fill the dumpster before you're done, call for a swap-out.
What do towns say about deck debris?
If you're in Mount Pleasant, the town's trash page says contractor-generated debris from construction, demolition, remodeling, or landscaping "should be hauled away by your contractor." The SC Department of Environmental Services has a page on construction and demolition debris for residents for homeowners doing their own demo.
Common questions about deck tear-outs
What size fits a second-story deck?
It goes in the 13. Tell us the deck's size, the stairs and the railing runs when you book.
Can composite decking go in the dumpster?
Yes. Composite boards go in the 13 with the wood. Tell us how much you have, since composite weighs more than wood.
Can treated lumber go in?
Yes. Treated deck boards, joists and posts go in with the rest of the wood.
Can I leave the footers in the ground?
Yes, if nothing is going back in that spot. Cut the posts at grade, and the lumber is the only load.
Can lattice and old deck furniture go in with the lumber?
Yes. Break lattice and railing down so they lie flat.
Tell us roughly how big the deck is and whether the footers are coming out. Text or call (843) 800-0689.
Need a dumpster in Charleston? Call or text Tony at (843) 800-0689, or order online.
(843) 800-0689 Get instant pricing